Welcome to the official website of Henan Yuke New Material Co., Ltd!

Telephone:15639728585 / 15649298103 / 15037180276  / 15036003371 

WeChat
WeChat

Waterproof backing board

新闻资讯

新闻资讯

current position: Home > News Center > Industry News

contact usContact Us

Henan Yuke New Material Co., Ltd

Phone: 15639728585

Phone: 15649298103

Phone: 15037180276

Phone: 15036003371

Email: 2634107059@qq.com

Website: hnykxcl.cn

Address: No.1 Courtyard, Fulin South Road, Baqian Township, Airport District, Zhengzhou City, Henan Province

How to use the matching adhesive for waterproof backing board?

2025-11-24 16:41:03
times

Guidelines for the use of waterproof backing board adhesive


Waterproof backing boards (such as ceramic tile backing boards, waterproof gypsum boards, etc.) are widely used in damp areas such as bathrooms, kitchens, basements, etc. in building decoration. The matching adhesive is a key material to ensure a strong bond between the backing board and the base layer, and its correct use directly affects the waterproof effect and engineering durability. This article will provide a detailed introduction to the construction steps, precautions, and common problem solutions for the matching adhesive.


---


1、 Preparation work before construction

1. Material inspection

-Confirm that the model of the matching adhesive matches the backing board (such as epoxy resin adhesive, polyurethane adhesive, or cement-based adhesive).   

-Check if the adhesive is within its shelf life, and if the packaging is not damaged, cured, or delaminated.   

-The backing board should be dry, free of oil stains, dust, or loose particles.


2. Tool preparation

-Tooth shaped scraper (recommended 6mm x 6mm tooth width), mixer, brush, glue gun (if using cylindrical glue), cleaning tools, etc.   

-Personal protective equipment: gloves, masks, goggles.


3. Grassroots treatment

-The base layer (wall or floor) must be flat, solid, without hollowing or cracks. The concave and convex areas need to be leveled with cement mortar.   

-Remove floating ash and oil stains from the base layer, and if necessary, use interface agents to improve bonding strength.   

-Wet base layer needs to be dried or quick drying adhesive should be used, but there should be no visible water.


---


2、 Preparation and application of matching adhesive

1. Adhesive preparation

-Two component adhesive: Mix the main agent and curing agent (such as A: B=2:1) according to the instructions, stir at low speed with an electric mixer for 3-5 minutes until there are no particles, let it stand for 5 minutes to mature before use.   

-Single component adhesive: Use directly after opening the can and stirring to avoid excessive mixing and mixing with air.   

-Attention: The amount of glue should be used up within 30 minutes each time to avoid waste during curing.


2. Glue application method

-Use a toothed scraper to evenly apply the adhesive to the back or substrate of the backing board (depending on the type of adhesive), with consistent scraping direction.   

-The thickness of the adhesive layer should be such that the tooth marks are clearly visible (usually 1-2mm). Excessive thickness can easily cause slippage, while insufficient thickness can affect the bonding strength.   

-Key areas (such as internal and external corners, pipeline surroundings) can be reinforced with additional adhesive coating.


---


3、 Laying and fixing of backing board

1. Laying operation

-Align the backing plate with the position, lay it from bottom to top or from inside to outside, and gently press it with your hand or rubber hammer to remove any air.   

-Reserve a 2-3mm gap between the boards (according to design requirements) to avoid thermal expansion and contraction deformation.   

-Use a cross locator to maintain even gaps, and clean excess adhesive with a damp cloth in a timely manner.


2. Auxiliary fixation

-When laying on a large area, temporary supports or tape can be used to fix it to prevent displacement.   

-Heavy backing plates (such as stone) require mechanical anchoring components (such as expansion bolts).


---


4、 Curing and maintenance

1. Initial setting time

-Usually 1-2 hours (depending on ambient temperature and humidity), avoid touching or loading during this period.   

-The recommended curing temperature is 5-35 ℃. In low-temperature environments, the curing time should be extended or heating measures should be taken.


2. Fully cured

-It usually takes 24-72 hours to reach strength, and during the curing period, avoid water immersion or vibration.   

-After curing, subsequent processes such as joint filling and waterproof coating can be carried out.


---


5、 Precautions

1. Environmental requirements

-The construction environment temperature is 5-40 ℃, and the relative humidity is ≤ 70%. Suspend work in rainy or high humidity environments.   

-Areas with poor ventilation should be equipped with exhaust equipment to prevent the accumulation of adhesive volatiles.


2. Safety protection

-Adhesives contain chemical solvents and should be kept away from sources of fire. Protective equipment should be worn during construction.   

-Immediately wash with soapy water after skin contact, seek medical attention if ingested.


3. Quality acceptance

-After solidification, check for any hollowing or detachment, and rework is required for areas with dull knocking sound.   

-The bonding strength can be verified through pull-out testing (standard value ≥ 0.5MPa).


---


6、 Common Problems and Solutions

1. The adhesive cures too quickly

-Reason: Excessive mixing volume or high ambient temperature.   

-Solution: Adjust the glue in stages to reduce the temperature of the construction environment.


2. Backboard hollowing

-Reason: The base layer is uneven, the adhesive layer is not evenly coated or not compacted.   

-Solution: Remove the hollow area and reapply with adhesive.


3. Insufficient adhesion of adhesive

-Reason: Untreated base or expired adhesive.   

-Solution: Thoroughly clean the substrate and replace it with qualified adhesive.


---


7、 Construction case reference

Construction of bathroom wall backing board

1. Grassroots treatment: Remove old tiles, level with cement mortar, and apply interface agent.   

2. Glue application: Use a toothed scraper to apply polyurethane glue on the back of the backing plate, with a glue layer thickness of 1.5mm.

3. Laying: Start laying from the corner of the wall, leaving a 2mm gap between the boards. After 48 hours, fill the gap and apply waterproof coating.


---


Through standardized construction, the matching adhesive of waterproof backing board can ensure long-term waterproofing and structural stability. It is recommended to strictly follow the product manual and conduct sample testing before large-scale construction. If you have any questions, you can consult material suppliers or professional technicians.