Welcome to the official website of Henan Yuke New Material Co., Ltd!

Telephone:15639728585 / 15649298103 / 15037180276  / 15036003371 

WeChat
WeChat

Waterproof backing board

新闻资讯

新闻资讯

current position: Home > News Center > Industry News

contact usContact Us

Henan Yuke New Material Co., Ltd

Phone: 15639728585

Phone: 15649298103

Phone: 15037180276

Phone: 15036003371

Email: 2634107059@qq.com

Website: hnykxcl.cn

Address: No.1 Courtyard, Fulin South Road, Baqian Township, Airport District, Zhengzhou City, Henan Province

What happened when the waterproof backing board dropped bricks

2025-11-24 17:01:02
times

Analysis and solution of brick falling off waterproof backing board


1、 Overview of the phenomenon of waterproof backing board falling bricks


The phenomenon of tiles falling off from waterproof backing board refers to the phenomenon of hollowing and falling off of the ceramic tiles laid on the surface of the building's exterior walls or indoor wet areas (such as bathrooms, kitchens, etc.) after using waterproof backing board as the base layer. This phenomenon is quite common in building decoration engineering, which seriously affects the functionality and aesthetics, and may even cause safety hazards.


2、 Analysis of the main reasons for the falling bricks of waterproof backing board


1. Material factors


(1) Quality issues with waterproof backing board

-Insufficient density of the board leads to poor nail holding force

-Improper surface treatment and insufficient adhesion

-The waterproof performance does not meet the standard, and the water absorption rate is too high

-The coefficient of thermal expansion does not match the ceramic tile


(2) Adhesive material issues

-Improper selection of tile adhesive (such as using ordinary cement mortar)

-Adhesive expired or of poor quality

-Adhesive and backing board are incompatible


(3) Ceramic tile issue

-Excessive or insufficient water absorption rate

-Improper backside treatment (residual release agent)

-Excessive size, concentrated thermal expansion and contraction stress


2. Construction process factors


(1) Improper handling at the grassroots level

-The surface of the backing plate is not cleaned thoroughly

-No interface processing or inadequate processing

-Uneven base layer and uneven thickness of bonding layer


(2) Construction method error

-Uneven application of adhesive

-Using dot pasting method instead of full pasting method

-Improper control of adhesive opening time


(3) Environmental factors have an impact

-Construction temperature too high or too low

-Excessive or insufficient humidity

-Poor ventilation conditions


3. Design factors


(1) Unreasonable construction design

-Not considering thermal expansion and contraction deformation joints

-Mismatch between waterproof layer and bonding layer

-Transition layer not set


(2) Improper material matching

-There is a significant difference in the thermal expansion coefficient between the backing plate and the ceramic tile

-Direct contact between rigid and flexible materials


3、 Solution for waterproofing backing board with falling bricks


1. Material selection optimization


(1) Select high-quality waterproof backing board

-Choose high-density boards with a density of ≥ 1.0g/cm ³

-The surface has undergone special treatment to enhance its adhesive strength

-Matching coefficient of thermal expansion with ceramic tiles


(2) Correct selection of bonding materials

-Use specialized tile adhesive (C1 or C2 standard)

-Consider using flexible adhesives

-Ensure compatibility between adhesive and backing board


(3) Ceramic tile selection

-Control the water absorption rate between 3-6%

-The back of large-sized ceramic tiles should be treated

-Avoid using excessively heavy or large ceramic tiles


2. Construction process improvement


(1) Grassroots treatment

-Thoroughly clean the surface of the backing plate

-Use specialized interface agent for treatment

-Ensure that the flatness of the base layer is ≤ 3mm/2m


(2) Adhesive construction

-Adopting the "thin pasting method" for construction

-Use a toothed scraper to ensure even adhesive layer

-Control the thickness of the adhesive between 3-8mm


(3) Construction environment control

-Temperature control between 5-35 ℃

-Relative humidity 40-70%

-Avoid direct sunlight and strong winds


3. Structural design optimization


(1) Set deformation joints

-Install an expansion joint every 6-8 meters

-Flexible treatment is set at the corners of yin and yang

-Leave gaps around door and window openings


(2) Layered design

-A transition layer is set between the waterproof layer and the bonding layer

-Consider using flexible waterproof coating

-The large brick adopts the "double-sided adhesive coating" process


4、 Preventive measures and daily maintenance


1. Conduct material compatibility testing before construction

2. Establish a comprehensive construction quality control system

3. Conduct hollowing inspection after completion

4. Regular inspection and maintenance, timely handling of minor issues


V. Conclusion


The problem of bricks falling off the waterproof backing board is the result of multiple factors and requires systematic prevention and control from multiple aspects such as material selection, construction technology, and structural design. By scientifically selecting materials, standardizing construction, and designing reasonably, it is possible to completely avoid the problem of falling bricks and ensure the quality and durability of decoration projects. In practical engineering, targeted measures should be taken according to specific situations, and professional technical personnel should be consulted when necessary to ensure that problems are thoroughly resolved.