Welcome to the official website of Henan Yuke New Material Co., Ltd!

Telephone:15639728585 / 15649298103 / 15037180276  / 15036003371 

WeChat
WeChat

Waterproof backing board

新闻资讯

新闻资讯

current position: Home > News Center > Tech News

contact usContact Us

Henan Yuke New Material Co., Ltd

Phone: 15639728585

Phone: 15649298103

Phone: 15037180276

Phone: 15036003371

Email: 2634107059@qq.com

Website: hnykxcl.cn

Address: No.1 Courtyard, Fulin South Road, Baqian Township, Airport District, Zhengzhou City, Henan Province

How to use the waterproof backing board leveling device

2025-11-24 17:36:22
times

Detailed explanation of the use of waterproof backing board leveling device


1、 Overview of waterproof backing board leveler


The waterproof backing plate leveler is a professional tool specially used to adjust the flatness of the backing plate during the waterproof construction of walls and floors. In building waterproofing engineering, the flatness of the backing board directly affects the construction quality and waterproofing effect of the waterproof layer. The leveler, through its unique design, can quickly and accurately adjust the position of the backing plate, ensuring that the base surface meets the desired flatness requirements.


Modern waterproof backing plate levelers are usually made of high-strength plastic or metal materials, which have the characteristics of lightweight, durability, and high adjustment accuracy. According to different construction requirements, leveling devices can be divided into two types: manual and mechanical, suitable for base treatment of various materials such as tiles, stone, waterproofing membranes, etc.


2、 Preparation before use


1. Tool and material inspection


Before using the waterproof backing board leveler, it is necessary to ensure that all tools and materials are fully prepared. In addition to the leveler itself, it is also necessary to prepare:

-Level or laser level

-Rubber hammer or wooden mallet

-Measuring ruler

-Marking pen

-Cleaning tools (brushes, cloths, etc.)

-Personal protective equipment (gloves, goggles, etc.)


2. Grassroots treatment


Grassroots treatment is a key step in ensuring the leveling effect:

1. Thoroughly clean the surface of the base layer of dust, oil stains, loose particles, and other debris

2. Check the strength of the grassroots to ensure that there are no defects such as hollowing or cracking

3. Perform preliminary leveling treatment on uneven areas

4. According to the design requirements, mark the reference line on the base by marking the line for positioning


3. Pre treatment of backing plate


1. Check the quality of the backing plate to ensure that there is no damage or deformation

2. Cut according to the actual size, paying attention to retaining appropriate expansion joints

3. Apply specialized adhesive on the back of the backing plate and use a serrated spatula to form uniform stripes


3、 Installation and adjustment of leveling device


1. Installation steps of leveling device


1. Place the base of the leveler on the predetermined positioning line

2. Insert the adjustment rod to ensure a secure connection with the base

3. Adjust the height setting of the leveler according to the thickness of the backing plate

4. Use a level to check the verticality of the leveler

5. Fix the position of the leveling device using temporary fixing clips or tape


2. Precise adjustment method


1. Preliminarily place the backing plate so that its edges are in contact with the leveler

2. Adjust the height by turning the fine adjustment knob on the leveling device

3. Use a rubber hammer to lightly tap the backing plate to assist in adjusting its position

4. Repeatedly check the levelness until reaching the ideal flat state

5. For large-scale construction, multi-point leveling method should be adopted, with a leveling point set every 60-80cm


4、 Precautions during construction


1. Operational skills


1. The adjustment force should be uniform to avoid deformation of the backing plate caused by excessive local stress

When multiple people cooperate in construction, unified command and coordinated actions should be taken

3. When encountering special areas (such as internal and external corners, around pipelines), specialized accessories should be used to assist in leveling

During the leveling process, the extruded adhesive should be cleaned at any time to avoid affecting the flatness after curing


2. Common problem handling


If it is found that the leveler slides unstably, additional fixing points can be added or the position can be changed

2. When encountering serious unevenness at the grassroots level, local repairs should be carried out first before leveling

3. If rebound occurs after leveling, the curing condition of the adhesive and the humidity of the base layer should be checked

4. For large areas of hollowing, they need to be dismantled and rebuilt, and cannot be forcibly leveled


5、 Inspection and maintenance after construction


1. Quality acceptance standards


1. Use a 2-meter ruler to check the flatness deviation, which should not exceed 3mm

2. The height difference between adjacent backing plates shall not exceed 1mm

3. The overall surface has no visible unevenness or bumps

4. All seams should be treated smoothly without any misalignment


2. Maintenance requirements


1. Avoid heavy object impact or vibration within 24 hours after leveling is completed

2. Keep the construction environment ventilated, but avoid strong winds blowing directly

3. Control the temperature and humidity of the curing environment according to the adhesive requirements

4. Regularly inspect during maintenance and promptly repair any problems found


6、 Safety operation standards


1. When working at heights, it is necessary to fasten safety belts and set up safety nets

2. Check the insulation performance of electric tools before use to prevent leakage

3. Chemical adhesives should be used in a well ventilated area to avoid inhaling harmful gases

4. Waste materials should be classified and collected, and disposed of according to environmental protection requirements

5. Clean up the site promptly after construction to eliminate safety hazards


7、 Application skills in different scenarios


1. Wall waterproofing construction


1. Adopt a top-down construction sequence, first fix the upper leveling device

For high-rise walls, they should be leveled in sections, with each section not exceeding 2 meters in height

3. Use a dedicated angle leveler at the corner to ensure the verticality of the internal and external corners


2. Ground waterproofing construction


1. Large areas of ground should be arranged with leveling points in the shape of a "field"

During slope construction, the leveling device needs to be used in conjunction with the slope gauge

3. Special areas such as floor drains should be equipped with encrypted leveling points around them


3. Construction in special environments


1. Choose rust proof leveling devices in humid environments and accelerate construction speed

2. Pay attention to the shelf life of adhesives in high temperature environments and mix them in batches

3. Insulation measures should be taken during low-temperature construction to ensure the normal curing of materials


8、 Maintenance and upkeep


1. Clean the leveling device promptly after each use to remove residual adhesive

2. Regularly check the flexibility of the adjusting components and add lubricating oil if necessary

3. Store in a dry environment to avoid deformation caused by heavy pressure

4. If parts are found to be worn or damaged, they should be replaced in a timely manner and should not be forced to be used


By following the detailed steps and precautions above, construction personnel can use the waterproof backing board leveler correctly and efficiently to ensure the construction quality of the waterproof project. Standardized leveling operations can not only improve construction efficiency, but also extend the service life of waterproofing systems, providing reliable waterproofing protection for buildings.